Beam & Block Layouts & Calculations for Building Control

Building Control will usually want to see how your floor works. We provide the beam layout drawing and calculations as part of your floor.

What Building Control asks for

For a beam and block floor, Building Control generally expects to see evidence that the floor can carry its loads safely. That normally means:

  • A beam layout drawing showing the beam positions, spacings, spans, bearings and any doubled beams.
  • Structural calculations for the beams under the loads the floor will carry, including partitions and any point loads.
  • Details of the void, ventilation and insulation, so the floor meets the other parts of the Regulations.

What our layout drawing shows

Item Why it matters
Beam type and length So the right beams are made and delivered
Spacings and block courses So the floor is laid as designed
Doubled or trebled beams Under partitions, baths and other heavy loads
Bearing details How the beams sit on the walls
Openings and trimming Around stairs, soil pipes and service entries

Changes on site

If the walls change, a partition moves or a new load appears, tell us. The layout and calcs can be updated so the floor still works and Building Control stays happy.

Send us your plans for a free quote or call 02475 095700.

Ready to get your floor priced?

Get a free quote →
Call us Get a quote